Open land with trees in the Portland area

Oregon and Washington · Land and lots

Land and lots for sale

City infill lots, rural acreage and building sites in the hills. Every lot and parcel on RMLS in our area, plus the questions that decide whether you can build what you have in mind.

·· for sale on RMLS right now

See them all on the mapAsk a broker

Newest first

Homes for sale now.

Straight from RMLS and refreshed through the day. Open any home for photos, the payment estimate and the map.

Open the map search

Live listings show here once the home search is connected. Until then, open the map search.

Before you buy

What to check on these homes.

Zoning comes first

Zoning decides what you can build and how many homes. Outside the urban growth boundary, farm and forest zones limit new homes, so read the county zoning before anything else.

Septic and wells

Rural lots without sewer need a septic site evaluation from the county, and a lot without a public water line needs a well. Make both part of your review period.

Utilities and access

Ask how far power, water and sewer are from the lot, who maintains the road and whether there is a recorded easement to reach it.

Slopes and wetlands

Steep slopes, streams and wetlands can shrink the area you can build on. A survey and a talk with the planning office save surprises.

Where to look

Narrow it to one area.

Each link opens the map search with this filter already on, limited to that city. Draw your own area on the map for anything more exact.

Clackamas CountyWashington CountyClark County, WANewberg and YamhillSandyPortland infillAll areas

Common questions

Questions buyers ask us.

Can I get a loan for land?

Yes, but land loans usually need a bigger down payment and carry a higher rate than home loans. Some buyers use a construction loan that covers the lot and the build together. A local bank or credit union is often the best place to start.

What is a septic feasibility test?

It is a site evaluation by the county or the state that checks whether the soil can handle a septic system and where it can go. Without an approval, you may not be able to build, so we write it in as a condition of the sale.

What is the urban growth boundary?

The Portland area has a line around the metro that separates land for city growth from farm and forest land. Inside it, building is easier and services are closer. Outside it, rules on new homes are much stricter.

How long does it take to get a building permit?

It depends on the city or county, the lot and the plans. Simple projects on ready lots can move in a few months, while lots that need studies or land use review take longer. Ask the permit office for current timelines.

Does this page include land with a home on it?

Mostly no. This page shows lots and land listed as land. For homes on large lots, use our acreage and farm searches.